Here we provide a detailed breakdown of 9 operational highway projects owned by National Infrastructure Trust. Each project is established as a Special Purpose Vehicle (SPV), a legal entity.
Two/Four Laning of BRT Tiger Reserve Boundary to Bangalore Section of NH-209 (Existing chainage from km. 287.520 to km. 461.550) in the state of Karnataka on Hybrid Annuity Mode under NHDP Phase- IV
Upgradation to 2 lane with paved shoulder/4 lane of Khajuwala - Poogal section (Design Chainage 0+000 to 30+812) and Poogal - Dantour - Jaggasar - Gokul - Goddu - Ranjeetpura - Charanwala - Naukh - Bap section of NH-911 (Design Chainage 1+430 to 182+725) (Total length 212.107 km) under Bharatmala Pariyojna in the state of Rajasthan on Hybrid Annuity Mode Basis
Balance work for Four laning of Kiratpur to Nerchowk section of NH-21 (from km 12+750 to km 26+500, km 126+500 to km 158+500 including ACC link road from km 0+00 to km 2+003) Greenfield Alignment (excluding Sundernagar Bypass) (Package-2) in the State of Himachal Pradesh on Hybrid Annuity Mode Basis
4/6 Laning of Narnaul Bypass Crossing to Paniyala Mor (NH-148B) (at NH-48 Junction)=31.24 Km, Nizampur Link Road=2.76 Km & Narnaul Bypass Crossing to Pacheri Kalan=11.30 Km (NH-11) in the State of Haryana under Bharatmala Pariyojana on Hybrid Annuity Mode Basis
4-Laning of Rampur - Kathgodam section of NH-87 (New NH No.9, 109) from km 42.791 (Design Chainage km 43.446) to km 88.000 (Design Chainage km 93.226) [Package - II] in the state of Uttarakhand under NHDP Phase – III on Hybrid Annuity Mode basis
Redesigning, Rehabilitation and Upgradation to Four Lane configuration & Strengthening of Rohna/Hassangarh to Jhajjar Section from Km 44.800 to km 80.250 (Design Chainage) (Length 35.450 km) of NH-334B in the State of Haryana on Hybrid Annuity Mode Basis
Redesigning, Rehabilitation and Upgradation to Four Lane configuration & Strengthening of UP/Haryana Border to Rohna Section from Km 0.00 to Km 44.80 (Design Chainage) (Length 40.500) of NH- 334B in the State of Haryana (Package-1) on Hybrid Annuity Mode Basis
Four laning of Rajauli-Bakhtiyarpur section of NH-31 (New NH-20) from Km 54+405 to Km 101+630 (Package II) on Hybrid annuity mode in the state of Bihar
4- Laning of Dewas Ujjain section of NH-148 NG from Design Ch. 0+000 to 19+733 & Construction of 4-Lane Ujjain Bypass from Design Ch. 19+733 to 26+900 (Part-I) and construction of 4-Lane Dewas Bypass from Design Ch. 0+000 to 14+520 (Part- II) with a total design length of 41.42 km in the State of Madhya Pradesh on Hybrid Annuity Mode Basis